|
“As founder of Walker Parking Consultants, Inc.
and Carl Walker, Inc., both national parking
consulting firms, I have worked with and
developed many professional executives.
Paul Mack is one of my favorites. He took
over a floundering regional office in Denver,
Colorado and turned it into one of Carl Walker,
Inc.’s more successful offices. Under
Paul’s leadership, the office served 11 states.
Paul has a professional demeanor and serves
clients fairly and with respect. His
success is largely due to hard work, meeting
commitments, and his ability to form and keep
meaningful relationships that go far beyond his
consulting abilities.” |
|
|
H. Carl Walker
President/CEO
CW Consulting, LLC
2429 Highpoint
Drive
Kalamazoo, MI 49008
269-217-7615 |
|
|
“Developing a full city block in the high
profile Common Platte Valley District in lower
downtown Denver for a cadre of patrons was a
challenging task. Many private and
governmental agencies, as well as the Regional
Transportation District (RTD) had voices that
were all listened to. The combining of ideas
resulted in an outstanding mixed-use campus.
Vehicle parking was of paramount importance so
we retained Parking Consultants LLC, a Denver
firm, to help us provide user friendly parking
spaces that would fill the needs of a diverse
group of users. Their expertise was
particularly beneficial during the concept and
schematic design phases. Construction
documents from Parking Consultants were clear,
concise, and complete. We have used this
firm on many other projects and will use them
again when appropriate”. |
|
|
George Feathers
III, CSI CCCA
Senior Project
Architect
Tryba Architects
1620 Logan Street
Denver, CO 80203
303-831-4010 |
|
|
“The full city block, three phase North Cherry
Creek multi-use project provides housing and retail
space in the upscale neighborhood across the street
from the Cherry Creek Mall, Denver’s premier
shopping center. Satisfying a variety of
parking needs for condominium owners, visitors, and
retail shop patrons required expert advice.
Parking Consultants LLC worked closely with us to
select parking equipment and wayfinding signage that
are intuitive and clear. They were flexible in
their scope of work and accommodated many changes to
the project as it developed.” |
|
|
Joseph Poli, AIA
Principal
Humphries Poli
Architects
2100 Downing Street
Denver, CO 80205
303-607-0040 |
|
|
“CSHQA won a design competition and was chosen
by Boise State University to design a parking
structure that would be the model for four
future garages. We realized we needed a
state-of-the-art parking consultant, and we
selected Carl Walker, Inc. because of the effort
Paul Mack put into the project by coming to
Boise for concept designs, Owner meetings, and
cost estimating. His planning acumen and
broad parking consulting knowledge helped the
project come in well under budget.” |
|
|
Jeff Shneider, AIA
President
CHSQA
250 S 5th
Street
Boise, ID 83702
208-429-4004 |
|
|
“I have worked with Paul Mack for many years and have found
him to be a person of high moral character and he does what
he says he will do. His professionalism and parking
consulting knowledge were the reasons we contracted with his
firm to design the 667 space parking structure serving our
new College of Law building. I am pleased with the
result.” |
|
Jeff Bemelen, P.E.
Director Facilities
Mgt.
University of
Denver
2400 S Race Street
Denver, CO 80208
303-871-3256 |
|
|
“Montana State University, Billings, wanted a
state-of-the-art parking structure to be the
gateway to the campus. To ensure that the
structure was properly designed, we contracted
with Paul Mack to lead the design effort for
structural and functional design of the garage.
His overall performance was very professional
and his work exceeded our expectations and was
totally acceptable to our client. Together
we worked out a way to provide a deck over a
canal which added many spaces and tied the
facility to an existing surface lot. We
appreciated his creativity and have used him as
a parking consultant on other projects.” |
|
|
Jeffery Kanning,
AIA
President
Collaborative
Design
Architects
2280 Grant Road,
Suite C
Billings, MT 59108
406-248-3443 |
|
|
“Having consultants on a project team that know
what they are talking about and interview well,
are vital to the team winning a project. Paul
Mack was our parking consultant for the 15th
and Pearl mixed-use garage in Boulder Colorado.
He was very effective in addressing neighborhood
concerns during a 3-day charette in Boulder.” |
|
|
Chris Shears, AIA
President
Shears Adkins
Architects
1821 Blake Street,
Ste 1A
Denver, CO 80202
303-436-9551 |
|
|
“Swinerton Builders built three parking
structures with Paul Mack leading the structural
engineering and parking consulting effort.
Two were for Lucent Technologies (920 and 750
spaces) and the third was for the Veterans
Affairs Medical Facility (700 spaces). The
VA garage was a design/build project.
Through Paul’s efforts, the projects were
completed early and within budget. We have
a good relationship with Paul and will continue
to use him as a parking consultant whenever
appropriate.” |
|
|
David
Wermerskirchen
Operations Manager
Swinerton Builders
6890 West 52nd
Ave, Ste 100
Arvada, CO 80002
303-423-9242 |
|
|
“When the City added a third garage in our central business
district, we selected Paul Mack to be our parking
consultant. He was very helpful and his suggestion to use
braced frames in lieu of shear walls opened view planes
within the garage creating a safer feeling for patrons.
I have known Paul for several years and have always found
him to be competent and easy to work with.” |
|
Gregory Warnke
Parking
Administrator
City of Colorado
Springs
30 S Nevada Ave,
Ste 504
Colorado Springs,
CO 80903
719-385-5682 |
|
|
“DPR Construction Company was in the process of
negotiating a parking structure for St. Josephs
Hospital. We had already retained Paul
Mack as our design/build team member to do the
structural engineering and parking consulting.
At the same time, he was discussing a parking
structure for Children’s Hospital across the
alley from our site. He convinced both
hospitals to form a joint venture and build one
large garage to serve both facilities.
Paul helped vacate the alley to gain land and
the result was a better, more efficient facility
that served both hospitals’ employees.” |
|
|
Dan McIntosh
Project Executive,
DPR Construction
Co.
6890 West 52nd
Ave, Ste 100
Arvada, CO 80002
303-423-9242 |
|
|
“When Wal-Mart contracted with Colorado
Structures, Inc. to construct a parking
structure for a new Superstore in southeast
Denver, it made sense for the design team to
subcontract the structural engineering and
functional design to a firm specializing in that
discipline. During the concept phase, Paul
Mack met with the team and CSI frequently and
helped set the footprint and parking modules. He
worked particularly well with our precast
concrete supplier and was instrumental in
delivering a quality garage.” |
|
|
Rob Oldach
Senior Vice
President
Colorado
Structures, Inc.
540 Elkton Dr.
Suite 202
Colorado Springs,
CO 80907
719-522-0500 |
|
|
“Paul Mack and CTA Architects Engineers have a
great relationship. On occasion, we have
hired him to do work for us and vice versa.
We know him to be a good engineer and parking
consultant, and he is a committed team member.
His input on the design of our city garage in
Great Falls, Montana was instrumental is making
that award winning project a good addition to
our portfolio.” |
|
|
Jim Wertman, AIA
Managing Partner
CTA Architects
Engineers
13 North 23rd
Street
Billings, MT 59103
406-248-7455 |
|
|
“Because our firm provides only concept
architectural design for a wide variety of
buildings, it is important that we receive
quality input from consultants. Paul Mack
has consistently guided us through the unique
requirements of parking structure design and has
helped us with zoning and planning issues.
His input on the 1890 Wynkoop project was
provided quickly and professionally, and his
owning a loft in a nearby building was helpful
to the design team when dealing with many
neighborhood organizations.” |
|
|
Chris Shears, AIA
President
Shears Adkins
Architects
1821 Blake Street,
Suite 1A
Denver, CO 80202
303-436-9551 |
|
|
“RNL has a long standing relationship with Paul
Mack. He is a well qualified parking consultant
and a good team member who understands timely
input as projects are being designed. He
has a keen sense of humor that has relieved
tension when differences of opinion have arisen
during project meetings. He has been a
good team member on several RNL projects
including 15th
& Pearl in Boulder, the Denver Zoo and Clayton
Lane in North Cherry Creek.” |
|
|
Dick Anderson, AIA
Principal
RNL Design
1050 17th
Street
Suite A-200
Denver, CO 80265
303-295-0845 |
|
|
“We could not have built the Banner Office
Building garage without the help of our parking
consultant Paul Mack. He was able to
communicate with a difficult owner and come up
with value engineering suggestions in a timely
manner. His structural design was simple,
but effective, and his parking module design was
very efficient. Paul specified
inexpensive, reliable access control equipment
as well as good graphics.” |
|
|
Jim Waugh
Project
Superintendent
F.W. Hall
Constructors
2000 S Colorado
Blvd,
Tower Two, Suite
2-500
Denver, CO 80222
303-365-6500 |
|
|
“The parking structure for the Colorado Springs
Police Operations Center was not just another
garage. YOW Architects were challenged to
provide a facility that would accommodate a
variety of unique vehicles including hazmat
vans, explosives trucks, and impounded cars on
hauling trailers. Our parking consultant, Paul
Mack, worked closely with us during all phases
of the project to make sure that traffic flow,
parking modules, and internal ramping would meet
the client’s needs.” |
|
|
Larry Whittaker,
AIA
Architect/Principal
YOW Architects
115 S. Weber, Suite
200
Colorado Springs,
CO 80903
719-475-8133 |
|
|
“Constructing a parking garage in Great Falls
was a significant event. It took years of
planning and budgeting before everything was in
place to design and build the garage.
Because Paul Mack had worked with our Billings
office before, he was a known parking consultant
with a good reputation, so he was retained to
work out the functional design details for the
City parking structure. As before, we
found his work to be concise, complete, and
professionally done through each phase of the
project.” |
|
|
Martin Byrnes, AIA
Associate Principal
CTA Architects
Engineers
701 2nd
Street South
Great Falls, MT 59405
406-452-3321 |
|
|
“Designing and constructing a 1,500 car parking
garage on a constrained site at Memorial
Hospital took a lot of cooperation from design
team members, contractors, and the hospital
staff. Precast concrete was used for the
superstructure because of its speed of erecting,
its minimal requirements for product delivery on
site, quality, and excellent opportunities for
architectural expression. During early
phases of the design, Paul Mack consulted with
the architect and structural engineer on
durability issues including slopes for drainage,
concrete water/cement ratios, corrosion
protection and waterproofing. His 25-years
experience in precast concrete design and
parking consulting were very helpful in the team
delivering an award winning project.” |
|
|
Charles LT Smith,
AIA
Principal
Charles LT Smith &
Assoc.
12 East Boulder
Colorado Springs,
CO 80903
719-475-9111 |
|
|
“While our 1986 parking structure was serving us
well, it needed a few repairs that were beyond
annual maintenance. We selected Parking
Consultants LLC to do an in-depth evaluation of
the garage, document structural and operational
problems, and provide us cost estimates for
repairs along with a priority list. We
found their work to be very professional,
concise and complete. Working closely with
a restoration contractor, they were able to
minimize disruptions to parkers while the work
was done.” |
|
|
Kenneth Hayward
Director of
Facilities
First Presbyterian
Church
219 E. Bijou Street
Colorado Springs,
CO 80903
719-884-6183 |
|
|
“When our project development team began
addressing how a wide variety of parking patrons
could best be served, we discovered a confusing
maze of access and control equipment.
Inquiries to vendors let us know this is an
industry that seems to change hourly, so we felt
a consultant would be very helpful. We
found Melissa Baughman at Parking Consultants
LLC to be the Swiss Army Knife of PARCS. Her
tenacity and knowledge resulted in a very good
parking control system for Solaris.” |
|
|
Sharon Puczynski
Project Coordinator
Solaris Vail
2211 S Frontage
Road
Suite A
Vail, CO 81657
970-479-7566 |
|
|
“Skillfully balancing parking needs with the
available supply for the myriad uses of the
highly popular Gardens was accomplished with the
help of Paul Mack from Parking Consultants LLC.
He analyzed existing and projected attendance
data, and provided comprehensive, professional
study results to help us in our decision making.
Paul also provided expertise in entry/exit
layouts, ramping and traffic flow to optimize
garage functions. Their work was concise and
presented in simple understandable language.” |
|
|
Keith Conner, AIA
Senior Associate
Tryba Architects
1620 Logan Street
Denver, CO 80203
303-831-4010 |
|
|
“Knowing what a signature parking structure this
would be, we took our time and listened
carefully to State representatives, the Santa Fe
Historic Board, and our consultants. No
ideas were discounted during charettes and
brainstorming sessions so our design team was
able to optimize all facets of the garage.
Our parking consultant, Paul Mack, worked with
the local precast concrete manufacturer some
25-years ago and that relationship bore fruit
throughout all design phases when member sizes
and connection details were selected. Paul
helped set drainage slopes, contributed to
durability criteria, and carefully completed
functional designs for the facility. We
found Parking Consultants to be very responsive
and easy to work with. They did what they
said they would do.” |
|
|
Ted Grumblatt, AIA
Principal
Fanning Bard Tatum
Architects
6100 Indian School
Rd. NE, #210
Albuquerque, NM
87110
505-883-5200 |
|
|
“While preparing our qualifications to interview
for this project, our thoughts were directed
more toward the office building than the parking
structure. When we started looking at the
garage, it became clear that garages are
complex; having sloped ramps, pedestrian/vehicle
maneuverability issues, and geometric
constraints. We selected Parking
Consultants LLC to join our team because of Paul
Mack’s good reputation in Montana and his
structural engineering experience. His
input evaluating structural systems
(post-tensioned vs precast), guiding us on
durability issues, and setting drainage slopes
were helpful. Their efficient functional
designs and parking equipment selections
resulted in a garage that is friendly and
accepted well by all patrons.”
|
|
|
Ben Tintinger, AIA
Principal
Mosaic Architecture
428 N. Last Chance
Gulch
Helena, Montana
59405
406-449-2013 |
|